Сompleted projects

  2020


Coal chemical plant with a capacity of 30 thousand tons per year for raw materials in the Republic of Kazakhstan. In May 2020, the first phase was launched.

UGHK 04062020 4 UGHK 04062020 5 UGHK 04062020 7

  2020


Start of commissioning of the Coal Chemical Plant with a capacity of 30 thousand tons per year for raw materials "UGH-30" in the Republic of Kazakhstan

UGHK 2810192 UGHK 2810195 

Construction of the first stage of the Petrochemical Plant with a capacity of 2 million tons per year for raw materials in the Republic of Kazakhstan

 2019


Project: Design of a coal chemical plant with a capacity of 30 thousand tons per year for raw materials "UGH-30" in the Republic of Kazakhstan

Project: Design of a petrochemical plant with a capacity of 2 million tons per year for raw materials in the Republic of Kazakhstan

 2018


 Project: Reconstruction of the refinery with the aim of introducing the Installation of catalytic conversion of medium fractions "UPKdt-150" and installation of gas separation and compression of propane / butane in the Akmola region of the Republic of Kazakhstan

2017


The catalytic conversion unit for light and medium-sized hydrocarbons was launched on the basis of the C41 / 25 unit in the Amur region. As a result of catalytic conversion on zeolite-containing catalysts, the freezing point of diesel fuel is reached -44 degrees Celsius.

  IMG 20171209 141603 IMG 8014

 2016


 Model catalytic cracking of vacuum gasoil launched in Indonesia

Indo1 indo2


2013


Installing C41/15 mounted in the Tomsk region


2011


Installing C 42/25 mounted in the Republic of Komi

img 1218 img 1220 img 1224 img 1227 


Installing C 41/15 launched in the Republic of Evenkia. The capacity from 10 to 12 thousand tons annually

photo1 photo2


Installing C 41/10 started in the Amur region. The capacity from 10 to 12 thousand tons annually

 photo1 photo2 photo4 photo5


2010


Installing C 44/500 launched in the Republic of Kazakhstan. Capacity 500 thousand tons annually

photo17 photo3 photo9 photo16 


Installing C 42/25 was launched in Donetsk, Ukraine. The capacity 25 thousand tons annually.

photo4 photo8


 2009


Two C33/35 launched in the Republic of Kazakhstan. The performance of each of 35 thousand tons annually.

 photo1 photo4 photo6 photo5  


2008 год


Installing C 41/10 launched in Tomsk region. The capacity from 10 to 12 thousand tons annually.

 

Installing C 31/10 launched in Tyumen region. The capacity from 10 to 12 thousand tons annually.

photo3 photo4 photo1 


2006


Installing C 31/10 started in the North of the Tomsk region. The capacity of 10 thousand tons annually

photo1 photo6 photo5

 

Installing C 31/10 was launched in Novosibirsk. The capacity of 10 thousand tons annually

Installing C 31/10 launched in Novosibirsk region. The capacity of 10 thousand tons annually

Experimental facility C 31 running Tomsk region. The capacity of 10 thousand tons annually